RESOURCE COLLECTION
LBE contract requirements (CMD Attachments)
Find required attachments for various LBE contracts.
Contract Monitoring DivisionDocuments
For contracts advertised on or after November 1, 2025.
CMD Attachment 1 - 11.01.2025
For construction contracts.
CMD Attachment 2 - 11.01.2025
For architecture, engineering, and professional services.
CMD Attachment 3 - 11.01.2025
For general services contracts.
CMD Attachment 4 - 11.01.2025
For micro-LBE set-aside construction contracts.
CMD Attachment 4A - 11.01.2025
For SFPUC regional micro-LBE set-aside construction contracts.
CMD Attachment 5 - 11.01.2025
For micro-LBE set-aside contracts for architecture, engineering, professional, and general services.
CMD Attachment 5A - 11.01.2025
For SFPUC regional micro-LBE set-aside contracts for architecture, engineering, professional, and general services.
CMD Attachment 6 - 11.01.2025
For SFPUC regional construction contracts.
CMD Attachment 6A - 11.01.2025
For SFPUC regional architecture, engineering, and professional services contracts.
CMD Attachment 7 - 11.01.2025
For design-build and construction manager/general contractor contracts.