INFO PAGE
RECOMMENDED NOISE ATTENUATION CONDITIONS FOR CHAPTER 116 RESIDENTIAL PROJECTS:
Community Outreach
Project sponsor shall include in its community outreach process any businesses located within 300 feet of the proposed project that operate between the hours of 9PM-5AM. Notice shall be made in person, written or electronic form.
Sound Study
Project sponsor shall conduct an acoustical sound study, which shall include sound readings taken when performances are taking place at the proximate Places of Entertainment, as well as when patrons arrive and leave these locations at closing time. Project sponsor shall engage the proximate Places of Entertainment to identify a Friday or Saturday evening, or best day/time to conduct the sound study based on scheduled entertainment at the venue. Readings should be taken at locations that most accurately capture peak sound from the Place of Entertainment to best of their ability. Any recommendation(s) in the sound study regarding window glaze ratings and soundproofing materials including but not limited to walls, doors, roofing, etc. shall be given highest consideration by the project sponsor when designing and building the project.
Design Considerations
(1) During design phase, project sponsor shall consider the entrance and egress location and paths of travel at the Place(s) of Entertainment in designing the location of (a) any entrance/egress for the residential building and (b) any parking garage in the building.
(2) In designing doors, windows, and other openings for the residential building, project sponsor should consider the POE’s operations and noise during all hours of the day and night.
(3) During the design phase, project sponsor shall consider an outdoor lighting plan at the development site to protect residents as well as patrons of surrounding Places of Entertainment.
Construction Impacts
Project sponsor shall communicate with adjacent or nearby Place(s) of Entertainment as to the construction schedule, daytime and nighttime, and consider how this schedule and any storage of construction materials may impact the POE operations.
Communication
Project Sponsor shall make a cell phone number available to Place(s) of Entertainment management during all phases of development through construction. In addition, a line of communication should be created to ongoing building management throughout the occupation phase and beyond.